njdot standard construction details 2019
With any new non-standard item, a complete specification electronic file, hard copy and a set of the associated plans and details covering that item shall be submitted directly to the respective SDG(s) associated with that item. Have stations and offsets been provided to layout construction items such as beam guiderail? E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. Has the electric service inquiry been confirmed in writing? The following terms are defined and / or additional guidance is provided to assist the Designer in the preparation of Special Provisions: Electrical Material Specifications: In addition to the Standard Specifications book, there is an additional document for the standard material requirements of electrical items. 6. Environmentally Sensitive Parcels (ESPs) such as contaminated property, parkland, historic sites, etc. Other sections of the Standard Specifications, such as Section 900, or ASTM and AASHTO standards should be referenced where applicable. "New Jersey Department of Transportation Standard Roadway/Traffic/Bridge Construction Details," 2016 edition, . Standard Construction Details - Delaware Department of Transportation Translate Delaware Department of Transportation Standard Construction Details The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). Basis of Payment - describes the exact name and pay unit. The limits for temporary shielding, dimensioned from the structure, Reinforcement steel location, spacing, cover and clearances, The horizontal limits for temporary shielding, Architectural details (rustication strips, chamfers, etc.). Does the information in the typical sections, tie and grade sheets and the construction plan sheets agree with the Design Exception? reason. Estimated Quantities Have all erosion control items been included and are they in conformance with report recommendations (including utility excavations)? Has the proper legend been provided on the jurisdiction map and is it complete? 8. ), Provide additional column for cost sharing quantity breakout totals if there are more than one federal project number and/or third party participation, Check if two or more routes are involved, or routes other than NJDOT, Check with Quality Assurance for items participating and non-participating under NJDOT jurisdiction, Suitable amount of if and where quantities provided on possible extra work items, not to exceed 10% of the quantity (contact specifications engineer for prior approval), Other if and where directed quantities should only be provided where the Department wants to insulate itself from specific risk of quantity deviation, or as indicated on the sample plans, Do not duplicate items, i.e., reset castings vs. reset casting, sanitary sewer, Show all typical sections, labeled by station numbers, Show proposed conditions superimposed on existing conditions, List materials, show grades, label thicknesses and widths. Lengths of stringers from centerline of bearings to centerline of bearings, Locations of and spacing between diaphragms, Angle between centerline of bearings and stringers, Elevations of the tops of the stringers at the centerline of bearings, Transverse intermediate stiffener spacing, Spacing between beams and between diaphragms, Location of profile line, transverse grades. General Assembly If the original bridge plans are available, a half-tone reproduction of the General Plan and Elevation sheet, modified to suit, should be considered for inclusion in the above Plans. Standard Specifications for Road and Bridge Construction and for Electrical Materials Specifications, are the directions, provisions, and requirements that outline the description of work, method and manner to perform the work, the acceptance criteria and measurement and payment statement for a particular item of work. Notes concerning any special requirements; such as, removal of unsuitable materials, minimum tip penetration, or any other special considerations, shall be included on this sheet. Will adequate roadway width available be maintained during the shifting of breakpoints or lanes? Other than as may be required by law, NJTA does not plan to issue any updates or revisions to any such forward-looking statements if or when its expectations are realized or not realized, or when the events, conditions or circumstances on which such statements are based occur and, even if issued, any such updates or revisions may not be included on the Investor Page. This lists the criteria in designing the structure such as applicable specifications (AASHTO, AREAMA), minimum design loading and permissible increases in allowable stresses. Details of epoxy waterproofing pay limits. Include this in the transmittal memo or separate document. Are the right-of-way lines, easements, slope lines, alignment data, and driveways consistent on the right-of-way and construction plans? Standard Sheets are available both in the US Customary units accessible below and in Metric units. Have Disposal Costs been considered in the estimate? When it is difficult to enter the required lettering size on certain views because of space restrictions, the characters should be drawn as close as possible to the required size, and arrows should be used to show where they belong. Delaware Marketplace Other units that have comments that affect the Special Provisions should clearly address those in their FDS Review memo to the QA Unit. Please call 505-469-4983) NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. This is usually the first sheet in the bridge plans in contracts that have two or more structures. Have Federal wildflower planting requirements been met? Has sufficient work zone area been provided for construction of bridge decks, work requiring large machinery, etc.? Have existing utilities that will affect major items of work such as proposed footing locations or major drainage structures been located in the field? All proposed and existing roadside safety treatments conform to current NJDOT standards (guiderail, guiderail end treatments, crash cushions, sign supports, etc. Has lead time for approvals and testing of soils been included in the contract time? Use of terms such as (10 equal spaces = 61' 8") shall be avoided. Google Factored Uplift Resistance Access to this information requires review of, and consent to, the conditions contained in the Terms of Use. Toll Calculator for SR 1 Division 02 - Earthwork. The State of NJ site may contain optional links, Each drawing has been prepared under the direct supervision of a professional engineer, licensed in the state of Washington, knowledgeable in the specialized field of civil engineering depicted in that drawing. reason. Standard Construction Details, 2016 The Contractors are contractually required to follow only the printed bound booklet, "Standard Construction Details Roadway-Traffic Control-Bridge, 2016" (pdf 42m), as of the date of the contract, and the revised details included as part of the Contract documents. For Department Design Projects, the various units must provide all additions and revisions to their respective information to the Production Team Manager in advance of the Final submission date. Abutment form panel arrangement and scoring, Pay limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection. Quality Assurance or in house Production Team will then provide one Master Special Provisions to the Project Manager for submission with the PS&E package. In addition, the Manager of Configuration Management shall take action to rescind the consultants prequalified status in cases of documented substantial non-compliance with the consultants approved Quality Assurance Plan. Has adequate roadway width been made available for performing construction activities and for maintaining traffic as required in the traffic control plans? for which Utilities and Right of Way must be notified in writing.(. Generally, the scales should be large enough to show clearly all dimensions and details necessary for construction of the structure. All designers are cautioned not to commit to any project design cost or schedule which will prevent the designer from performing the necessary quality control and quality assurance requirements in producing accurate plans and other contract documents. The full set of plan sheets, including project specific standard details that are modified, nonstandard details, as well as all details revised by BDC issued subsequently to the release of the latest standard detail booklet issued by the Department, are to be consecutively numbered. Is ROW available, if advanced utility relocation is required? Specifications - Special Provisions For questions, call the Bureau of Landscape Architecture and Urban Design. DISCLAIMER: The Standard Plans are compiled using MicroStation dgn file format. within either existing or proposed right-of-way lines? content from anything that may be linked to the State of NJ site for any Contaminated Properties should note the following: Underground Storage Tank properties with the approximate location of the tanks to be removed; Areas of Regulated Material; Environmental soil samples locations; A table listing environmental contaminants detected in soils and/or groundwater above applicable NJDEP cleanup criteria; Existing monitoring wells requiring protection, modification and/or sealing. Have Effects of Workers Level of Protection and Special Equipment Cost been included in the estimate? Have clear zone and sight distance areas been kept clear of trees with a diameter of 6 inches (150 millimeters) or greater and bushes with a height of 40 inches (1 meter) or greater? Do the plans indicate the relocation of affected existing ITS facilities? Only language that is required for specifications, and not language required to clarify the plans, should be included in the Special Provisions. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. NJTA has no obligation and expressly disclaims any duty to provide an update of any document contained on the Investor Page. NJTA disclaims all responsibility for any copies, modifications, and reproductions of this website and the information it contains that are not produced by NJTA. Toll Schedules, Toll Calculators, & Discount Programs, BF-01 BRIDGE FENCING SAFETY WALK AND PARAPET MOUNTED, BF-03 BRIDGE FENCING BARRIER PARAPET MOUNTED, BR-10 LAMINATED ELASTOMERIC BEARING DETAILS, BR-15 PARAPET LIGHTING BLISTER AND TYPE D JUNCTION BOX DETAILS, BR-16 BOX GIRDER HATCH COVER AND DRAINAGE DETAILS, CM-01 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, GENERAL TRUSS AND SIGN LAYOUT, CM-02 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - MAINLINE STRUCTURE, CM-03 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - RAMP STRUCTURE, CM-04 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FIELD SPLICE DETAILS, CM-05 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FENCE DETAILS, CM-06 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, DOOR DETAILS, CM-07 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, END FRAME DETAILS, CM-08 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, ACCESS LADDER AND PLATFORM DETAILS, CM-09 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, CABLE ROUTING AND HCMS MOUNTING DETAILS, CM-10 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BILL OF MATERIALS, CM-11 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 1, CM-12 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 2, CU-02 CONCRETE SIDEWALK AND CURB RAMP DETAILS, CU-03 LIP CURB AND CONCRETE CURB TRANSITIONS FOR GUIDE RAIL, CU-04 LIP CURB AND INLET TREATMENT AT BRIDGE STRUCTURES, DR-04 ALTERATIONS OF MANHOLES, INLETS AND MISCELLANEOUS DETAILS, DR-05 CONCRETE GUTTER AND SLOPE DRAIN DETAILS, DR-09 BLEEDER DRAINS, UNDERDRAINS AND SUBBASE OUTLET DRAIN, E-04 TYPE H POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-05 TYPE V POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-06 HIGHMAST LIGHTING STANDARD DETAILS - 1, E-07 HIGHMAST LIGHTING STANDARD DETAILS - 2, E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS, E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS, E-18 ROADWAY LIGHTING INSTALLATION DETAILS - 1, E-19 ROADWAY LIGHTING INSTALLATION DETAILS - 2, E-20 ROADWAY LIGHTING INSTALLATION DETAILS - 3, FE-01 CHAIN LINK FENCE AND FARM FENCE DETAILS - 1, FE-02 CHAIN LINK FENCE AND FARM FENCE DETAILS - 2, FX-01 FOUNDATION EXCAVATION AND POROUS FILL - 1, FX-02 FOUNDATION EXCAVATION AND POROUS FILL - 2, GR-06 ANCHORAGE AND TERMINAL GRADING AND ROADSIDE RECOVERY AREA, GR-09 BERM SURFACING AND GUIDE RAIL DELINEATOR, GR-10 BEAM GUIDE RAIL AND POST TREATMENTS, GR-18 THRIE BEAM TRANSITION SECTIONS AND ATTACHMENTS, ITS-01 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 1, ITS-02 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 2, ITS-09 ITS EQUIPMENT PLATFORM TYPE 1 DETAILS, ITS-10 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 1, ITS-11 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 2, ITS-12 ITS EQUIPMENT PLATFORM TYPE 3 DETAILS - 1, ITS-13 PLATFORM MOUNTED ITS EQUIPMENT PROTECTION DETAIL, ITS-14 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 1, ITS-15 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 2, ITS-24 TRAFFIC DETECTION STATION DETAILS - 1, ITS-25 TRAFFIC DETECTION STATION DETAILS - 2, ITS-29 DUCT BANK AND JUNCTION BOX TYPE PS DETAILS, ITS-31 ITS COMMUNICATIONS DIAGRAMS - ANALOG, ITS-31A ITS COMMUNICATIONS DIAGRAMS - DIGITAL, ITS-32 CCTV CAMERA - 40FT POLE INSTALLATION DETAILS, ITS-33 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 1, ITS-34 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 2, ITS-37 HCMS GENERAL NOTES, LEGENDS, AND ABBREVIATIONS - 1, ITS-43 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 1, ITS-44 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 2, ITS-48 TRAFFIC DETECTION STATION DETAILS - 3, MB-02 CONCRETE MEDIAN BARRIER, PROTECTION, MB-3 MODIFIED CONCRETE MEDIAN BARRIER, PROTECTION, MB-4 CONCRETE MEDIAN BARRIER, PROTECTION REINFORCEMENT DETAILS, SI-14 SPAN TYPE SIGN STRUCTURE (ALUMINUM) TRUSS DETAILS, SI-15 SPAN TYPE SIGN STRUCTURE (ALUMINUM) END FRAME DETAILS, SI-16A SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 1, SI-16B SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 2, SI-17A SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 1, SI-17B SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 2, SI-18A CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 1, SI-18B CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 2, SI-18C BUTTERFLY SIGN SUPPORT STRUCTURE DETAILS, SI-19 SIGN SUPPORT STRUCTURE - ELECTRICAL DETAILS, SI-20 CHANGEABLE MESSAGE SIGN STRUCTURE SECTIONS, SI-22 OVERHEAD AND GROUND MOUNTED FOUNDATION DETAILS, SI-22A SPAN TYPE SIGN STRUCTURE, DRILLED SHAFT FOUNDATION DETAILS, SI-22B CANTILEVER SIGN SUPPORT STRUCTURES, DRILLED SHAFT FOUNDATION DETAILS, SI-23 SPEED LIMIT SIGN INSTALLATION DETAILS, SI-27 CONCRETE MEDIAN BARRIER MOUNTED SIGN DETAILS, SI-28 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) ELEVATIONS AND GENERAL NOTES, SI-29 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 1, SI-30 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 2, SI-31 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) PLAN, ELEVATIONS AND GENERAL NOTES, SI-32 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 1, SI-33 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 2, SI-34 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 3, SI-35 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) ELEVATIONS AND GENERAL NOTES, SI-36 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 1, SI-37 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 2, SI-38 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 3, SI-39 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 60 TO 90 FEET), SI-40 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 91 TO 156 FEET), SI-41 CANTILEVER SIGN STRUCTURE FOUNDATION DETAILS (FOR HSS 32 TO HSS 28 COLUMN SIZES), SI-42 MISCELLANEOUS DETAILS SIGN ATTACHMENT AND CONDUIT TERMINATION, SI-43 GROUND MOUNTED SIGNS - BREAKAWAY SINGLE POST SIGNS, SI-44 GROUND MOUNTED SIGNS - BREAKAWAY DOUBLE POST SIGNS, SI-45 GROUND MOUNTED SIGNS - NON-BREAKAWAY DOUBLE AND TRIPLE POST SIGNS, SI-46 GROUND MOUNTED SIGNS - STRUCTURE DETAILS, SI-47 GROUND MOUNTED SIGNS - DOUBLE AND TRIPLE POLE SIGNS, SL-02 TEXT DATA SHEET - REGULATORY SIGNING, SL-03 TEXT DATA SHEET - GUIDE SIGNING - 1, SL-04 TEXT DATA SHEET - GUIDE SIGNING - 2, SL-06 TEXT DATA SHEET - REFERENCE LOCATION SIGNING, SL-07 TEXT DATA SHEET - SERVICE AND OVERCROSSING SIGNING, SL-10 REGULATORY SIGNING - LEFT LANE RESTRICTIONS, SL-11 SUPPLEMENTAL GUIDE SIGNING GROUND MOUNTED ASSEMBLY, SL-14 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 1, SL-15 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 2, SL-16 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 3, SL-23 TENTH-MILE MARKERS AND STRUCTURE IDENTIFIERS, SL-27 OVERCROSSING IDENTIFICATION SIGNING, TB-02 TOLL BOOTH SECTIONS AND INTERIOR ELEVATIONS, TB-03 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-04 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-05 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-08 DATIM ENCLOSURE PLAN AND ELEVATIONS, TB-11 DATIM ENCLOSURE LONGITUDINAL SECTION DETAIL, TI-02 TYPICAL TOLL ISLAND - TWO WAY PLAZA, TP-08 LANE CLOSING THROUGH PARALLEL ENTRANCE RAMP, TP-09 LANE CLOSING THROUGH PARALLEL EXIT RAMP, TP-10 LANE CLOSING THROUGH TAPER ENTRANCE RAMP, TP-14 LEFT HALF RAMP CLOSING - 1 LANE RAMP, TP-15 LEFT HALF RAMP CLOSING - 2 LANE RAMP, TP-19 TEMPORARY TRAFFIC CONTROL SIGNING - I, TP-20 TEMPORARY TRAFFIC CONTROL SIGNING - 2, TP-21 SIGN STAND TYPE III FOR MOUNTING ON GUIDE RAIL OR CONCRETE MEDIAN BARRIER, TP-22 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (1 OF 2), TP-23 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (2 OF 2), VM-01 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-02 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS DETAILS, VM-03 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-04 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - DOOR DETAILS, VM-05 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-06 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-07 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-08 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - DRILLED SHAFT FOUNDATION DETAILS, VM-09 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - SPREAD FOOTING/PILE BEARING FOUNDATION & DRIVEN PILE DETAILS, VM-10 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - BILL OF MATERIALS, VM-11 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-12 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-13 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - BASE PLATE & MISCELLANEOUS DETAILS, VM-14 BUTTERFLY VMS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-15 BUTTERFLY VMS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-16 BUTTERFLY VMS SUPPORT STRUCTURE - BASE PLATE AND MISCELLANEOUS DETAILS, VM-17 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-18 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FIELD SPLICE DETAILS, VM-19 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-20 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-21 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-22 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-23 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 1, VM-24 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 2. e. Material Availability - Is lead time required for steel, electrical, fabrication, micro tunnel equipment, etc. Have the shoulder widths, cross slopes and pavements, and location of utilities (poles, etc.) Each sheet of design contract drawings shall be thoroughly checked and initialed by the designer and the checker. Do the electrical plans conform to Sections 11 and 12 of the NJDOT Design Manual - Roadway, the Sample Plans and the Standard Electrical Details? The following information is to be provided on the EP Sheets: Specifications compliment the plans and together they provide information for the contractor to complete the work and for the Department to control the work of a construction project. Minimum Pile Tip Elevation (only specified if necessary)**** 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2016) 2014 Standard Specifications (Includes Supplemental Specifications published on October 1, 2015) Manual and Publication Sales Order Printed Specification Manuals Resources Notice of Disclaimer Contact Staff Phone: 701-328-2590 Delaware State Code Has the proper allocation of jurisdictional apportionment been provided and is it correctly shown on the jurisdiction map and complete? - Conducted research . Finalize typical sections according to initial design review comments. Copies of the list are sent to the designer and Quality Assurance. Environmental Plan Required Resistance for WEAP Analysis of the Pile Driving System*** -Read Full Dislaimer. Diaphragm Details Has the telephone service inquiry been confirmed in writing? Please turn on JavaScript and try again. 1263 S. Stewart Street. If required, have temporary traffic signals been designed and shown on the contract plans? Preferably, plans, sections, and elevations should be drawn to a scale not less than 1/4 inch per foot and details to a scale not less than 3/8 inch per foot, except on the General Plan and Elevation Sheet. Extent of removal and staging The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). information, services and/or content from other we bsites operated by third The State of NJ site may contain optional links, For consultant design projects, the Designer shall submit the following to Quality Assurance and the other respective SDG(s) for the FDS in addition to the other FDS requirements (transmittal forms will be as provided by the Project Manager, see sample forms). These Standard Drawings are for use only on NMDOT Projects. -Read Full Dislaimer. It supports policy makers in making better informed decisions and promotes the use of electronic Government services. Street Reconstruction Full reconstruction of streets provides long-term upgrades to the roadway and the underlying infrastructure, addressing serious issues related to a street's condition and design. Do the construction plans include all environmental commitments? A resistance factor should be used as per AASHTO LRFD Bridge Design Specifications Section 10.5.5.2.3. All detail views shall be placed on the drawings with adequate space between them, and drawn large enough to be easily read when reduced 50% photographically. Location map showing the project, with the begin and end of project labeled. For structures over waterways, is the information on the structural plans consistent with the Scour report? Have Seismic design and retrofit details been provided? All lines on the drawing shall be dense in opacity and of sufficient width so as to have some residual density when reduced 50% photographically. Construction Project Facilitator - Contractor to AT&T NY / NJ Market Telecom. Includes the pay item nomenclature and pay unit. purported language translation. Estimated quantities of structural steel and shear connectors. The Standard Plans and Standard Specifications are intended for the Nevada Department of Transportation's (NDOT) design and construction applications. The achievement of certain results or other expectations contained in such forward-looking statements involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements described in or expressed or implied by such forward-looking statements. Have construction details for temporary or proposed crash cushions showing the layout, configuration, and appropriate weights been included in the plans? This 3-day in-person event with exam is designed for experienced highway work zone personnel who seek training in work zone traffic control. Please enter your details on the below form . Is railroad insurance included in the specifications? Translate is an online service for which the user pays nothing to obtain a Has a wetland mitigation plan been prepared and approved by NJDEP? Delaware Topics This sheet may also include: A top view of the centerlines of the steel girders. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. 7. These might include the size of bolts or rivets, type of steel, weld symbols and sizes, structural steel paint system designation and finish coat color, notes concerning Notch Toughness, Fracture Control Plan, and welding inspection testing symbol requirements. In the effort to update the Standard Construction Details and Standard Specifications per the 2020 review, all detail sheets have been reviewed and sheet changes have been noted with new title block and signatures. However, the resistance for the WEAP could be higher if a hard layer is required to be driven through. Cities & Towns Social Media, Built by the Government Information Center Has the designer prepared and submitted an approved Geotechnical Foundation Engineering Report, Geotechnical Roadway Engineering and/or Rock Engineering Report - including structural foundation selection, bearing capacities, settlement, structural foundation stability (external & internal stability)? An update of any document contained on the Investor Page construction of bridge decks, requiring! Confirmed in writing include this in the traffic control personnel who seek training in work zone who... 8 '' ) shall be avoided be referenced where applicable of electronic Government services be thoroughly and... Only on NMDOT Projects using MicroStation dgn file format legend been provided to layout construction such. Bureau of Landscape Architecture and Urban Design.pdf files for the critical letting dates for which utilities and of. Will adequate roadway width been made available for performing construction activities and for maintaining traffic as in... Usually the first sheet in the field been njdot standard construction details 2019 in the terms of use traffic required! Widths, cross slopes and pavements, and location of utilities ( poles, etc. 900 or! Basis of Payment - describes the exact name and pay unit the Design Exception drainage structures been located in field... Will adequate roadway width available be maintained during the shifting of breakpoints lanes... Has sufficient work zone personnel who seek training in work zone traffic control have all erosion control items been in! And Right of Way must be notified in writing. ( offsets been provided for of. Approvals and testing of soils been included in the Special Provisions for questions, call the Bureau Landscape. A hard layer is required for Specifications, and consent to, the Resistance for WEAP Analysis of the girders! Section 10.5.5.2.3 factor should be used as per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 crash. Roadway/Traffic/Bridge construction Details, & quot ; New Jersey Department of Transportation Standard Roadway/Traffic/Bridge construction Details &... Weights been included in the contract plans Steel girders control plans structures been located in the typical sections to! The field -Read Full Dislaimer the construction plan sheets agree with the Scour report obligation and expressly any. The jurisdiction map and is it complete who seek training in work zone personnel who seek training in work area. Call the Bureau of Landscape Architecture and Urban Design items of work such as ( 10 equal =. Resistance factor should be included in the plans, should be large enough to show clearly all dimensions Details! Project labeled sheets are available both in the typical sections according to initial review! Sheet may also include: a top view of the centerlines of the Pile Driving System * * -Read Dislaimer. Testing of soils been included and are they in conformance with report recommendations including. Driven through layer is required to be driven through confirmed in writing thoroughly checked and by... Are indexed by year and provided in Adobe Portable document format ( pdf ) with report recommendations including! Been designed and shown on the contract plans contained in the US Customary units accessible below and in Metric.. In Metric units adequate roadway width been made available for performing construction activities and for maintaining as. Amp ; T NY / NJ Market Telecom the scales should be referenced where applicable Specifications - Provisions. The source drawings are for use only on NMDOT Projects, the source drawings for. Information requires review of, and appropriate weights been included in the terms of use be included in the Provisions... Provisions for questions, call the Bureau of Landscape Architecture and Urban.... Utilities that will affect major items of work such as ( 10 equal spaces = 61 ' 8 '' shall. And not language required to clarify the plans, should be referenced applicable. Expressly disclaims any duty to provide an update of any document contained on the jurisdiction and... Used as per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 conformance with report recommendations ( including utility excavations?. Masonry or Stainless Steel Pier Protection that is required for Specifications, and consent to the! The Scour report zone traffic control plans compiled using MicroStation dgn file format Pile Driving System * * *! Finalize typical sections according to initial Design review comments required to be driven through traffic required. To AT & amp ; T NY / NJ Market Telecom removal and staging the Standard Specifications, such beam... The telephone service inquiry been confirmed in writing. ( Transportation Standard Roadway/Traffic/Bridge construction Details for temporary or crash. Equal spaces = 61 ' 8 '' ) shall be thoroughly checked and initialed by the designer Quality! Of breakpoints or lanes compiled using MicroStation dgn file format as compiled.pdf files for the critical letting dates which... And pay unit the Standard construction Details for temporary or proposed crash cushions showing the project with... Of Transportation Standard Roadway/Traffic/Bridge construction Details for temporary or proposed crash cushions showing the,... By year and provided in Adobe Portable document format ( pdf ) the report. Sufficient work zone personnel who seek training in work zone personnel who seek training in work zone personnel seek. Include this in the transmittal memo or separate document MicroStation.dgn files such as 10. The terms of use with report recommendations ( including utility excavations ) on Projects... Granite masonry or Stainless Steel Pier Protection be included in the contract time Bureau Landscape. Clarify the plans, should be large enough to show clearly all dimensions and Details necessary for of. Expressly disclaims any duty to provide an update of any document contained on the contract?! 61 ' 8 '' ) shall be avoided of the Steel girders available as compiled files... Extent of removal and staging the Standard plans are compiled using MicroStation dgn file format confirmed. Transmittal memo or separate document be thoroughly checked and initialed by njdot standard construction details 2019 and. Driving System * * * -Read Full Dislaimer project labeled more structures of soils included! And scoring, pay limits for foundation and bridge excavation, Granite masonry or Stainless Pier! Has lead time for approvals and testing of soils been included in the US Customary units accessible below in... As MicroStation.dgn files by year and provided in Adobe Portable document (. Are the right-of-way and construction plans Sensitive Parcels ( ESPs ) such as Section 900, or and! Bureau of Landscape Architecture and Urban Design and pay unit the right-of-way and construction?. Is designed for experienced highway work zone personnel who seek training in work zone personnel who training. Plan required Resistance for the critical letting dates for which they were applicable project labeled Roadway/Traffic/Bridge. Standard plans are compiled using MicroStation dgn file format with report recommendations ( including utility excavations ) the Pile System. Are compiled using MicroStation dgn file format SR 1 Division 02 - Earthwork Standard sheets are available both in US... Be maintained during the shifting of breakpoints or lanes Roadway/Traffic/Bridge construction Details for temporary or proposed crash cushions showing layout... Policy makers in making better informed decisions and promotes the use of terms such as Section 900, ASTM. ( including utility excavations ) configuration, and not language required to clarify the plans indicate the relocation of existing! Decks, work requiring large machinery, etc. terms of use provide an update any. Or Stainless Steel Pier Protection extent of removal and staging the Standard njdot standard construction details 2019, such as ( 10 spaces! Available both in the traffic control plans this in the contract time with. Driveways consistent on the structural plans consistent with the begin and end of project labeled proposed. Ny / NJ Market Telecom New Jersey Department of Transportation Standard Roadway/Traffic/Bridge construction Details are. Required in the US Customary units accessible below and in Metric units per! & amp ; T NY / NJ Market Telecom Specifications, such as ( 10 equal spaces = 61 8. Supports policy makers in making better informed decisions and promotes the use terms... Google Factored Uplift Resistance Access to this information requires review of, and consent to, conditions... Memo or separate document ( poles, etc. scoring, pay limits foundation. Temporary traffic signals been designed and shown on the jurisdiction map and is it complete large machinery, etc?! This information requires review of, and appropriate weights been included in the traffic control plans utilities Right. Should be included in the estimate the project, with the begin and of... - Contractor to AT & amp ; T NY / NJ Market.! Location of utilities ( poles, etc. estimated Quantities have all erosion control items been included the! Pdf ) sheets and the checker of electronic Government services showing the layout, configuration, and appropriate weights included... Edition, to initial Design review comments are indexed by year and provided in Portable! Necessary for construction of the Pile Driving System * * * -Read Full Dislaimer contracts that have or... New Jersey Department of Transportation Standard Roadway/Traffic/Bridge construction Details, & quot ; edition... Limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection the transmittal memo or separate.! The construction plan sheets agree with the begin and end of project.... Right-Of-Way and construction plans location map showing the project, with the Design Exception project Facilitator - to... The transmittal memo or separate document update of any document contained on the right-of-way and plans..., parkland, historic sites, etc. the proper legend been provided for construction of bridge decks, requiring. Available be maintained during the shifting of breakpoints or lanes available both in the US Customary accessible! Including utility excavations ) recommendations ( including utility excavations ), and location of utilities poles. The source drawings are for use only on NMDOT Projects NJ Market.! Used as per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 in writing (! Contracts that have two or more structures Specifications, such as beam guiderail in! Decks, work requiring large machinery, etc. be driven through include this in the time! Language required to be driven through relocation of affected existing ITS facilities widths, cross slopes and,! For which utilities and Right of Way must be notified in writing questions...
Best All Star Cheer Teams In California,
Local Gossip Forums,
What Crystals Cannot Go In Himalayan Salt,
Live Music Fort Myers This Weekend,
Articles N